Utility tunnel and roadway for initialization section at Shenzhen Airport New Area
Date:2018/7/17 Source: CISDI
Built by CISDI on an EPC basis, covering 19 urban roads, 8 of which are set with utility tunnels, totaling a length of about 16.642km
A specialized design for addressing the existing problems in utility tunnels:
Put the whole drain line into the utility tunnel by butting the crossings of tunnel with drain cabins, an integrated way for drain pipeline network arrangements, and dredging through inside the tunnel
Create the first tunnel-integrated scale drain project for tackling the conventional inconvenient operation by means of embedded drain piping and locally integrating with the tunnel
Use the horizontal or vertical pipe jacking way to avoid sections where excavations are not allowed; use framing construction and asymmetrical piles to cater for narrow roads; alleviating influences on ground traffic
Apply an intelligent control system for the pipe tunnel’s online centralized monitor and operations management, based on a unified information management platform, GIS and automatic patrol robot
Complete a fast construction of the utility tunnel’s main body by a prefabricated assembly method, reducing impacts on ground traffic